Resource library

Make the methodology visible before the sales call.

Carnet's resource library should carry the credibility burden: how the rating is calculated, which evidence is accepted, how optimization is verified, and what a customer is allowed to claim.

Recommended release discipline: publish executive summaries on the website. Keep detailed templates, data dictionaries, and Singapore program evidence gated for qualified partners and investors.
Whitepaper

Sustainable Compute Methodology v1.0

Defines the asset boundary, power and grid capacity ledger, carbon and clean energy ledger, water and cooling ledger, allocation layer, evidence room, rating levels, and optimization verification rules.

Request
Technical note

AI Data Center Power, Water, and Carbon Pressure Index

Explains how Carnet evaluates local resource pressure: contracted capacity, peak draw, grid congestion, WUE, cooling route, water-stress exposure, clean energy quality, and carbon budget risk.

Request
Guide

Workload-Level Carbon and Clean Energy Attribution Guide

Shows how workload, GPU-hour, API call, customer unit, and contract period allocation should be used without confusing allocation granularity with physical traceability.

Request
Dossier

Singapore Sustainable Compute Adoption Note

Summarizes the Singapore program context, methodology use, partner responsibilities, evidence status, and claim boundaries. The final public wording should be matched to signed evidence.

Request

Evidence templates for real assessments.

These templates make the site feel like an operating company because they show what Carnet needs to review. They also qualify inbound leads quickly.

Data center assessment intake

  • Facility location and operating boundary
  • IT load, total energy, PUE, WUE, CUE
  • Grid connection, contracted capacity, peak profile
  • Cooling system, water source, heat reuse status

Compute product record intake

  • Compute product, region, SLA, and hardware type
  • GPU-hour or workload allocation denominator
  • Customer reporting period and claim language
  • Evidence owner and verifier contact path

Optimization evidence intake

  • EAC / REC / GO / PPA contract and retirement status
  • Behind-the-meter supply or self-supply records
  • Cooling, cloud, or workload optimization action
  • Before / after rating and exception log

Turn a resource pack into a live assessment.

Share your site boundary, compute product, customer allocation need, or public-sector review requirement. Carnet will return a scoped evidence checklist.

Request resources